Korea Goseong hai thermal power plant / Intake Shield TBM

Summary

During the construction of Goseong High Thermal Power Units 1 and 2 (1,040MWx2) power plant in Deokho-ri, High-myeon, Goseong-gun, Gyeongsangnam-do, the construction of the cooling water intake reactor was carried out. The cooling water supply method to the water intake pipe in the cooling water system was constructed by the SHIELD TBM (EPB) method using one 8.24m diameter TBM equipment to avoid interference from the 4th treatment plant. The efficiency of the cooling water system is directly related to the efficiency of the entire plant, so the purpose of the installation is to ensure that the function of the intake pipe is stable

  • Begin 2017.11

    Client Goseong Green Power

  • Location Goseong, Gyeongsangnam-do, Republic of Korea

    Explanation EPB TYPE (D=8,240mm / L=790m)
       - Excavation Diameter : D=8,240mm
    Arrival area Cassion fabrication and mounting, water intake tower mounting